Working on the Excavation with the Bobcat   8/17

The Depot - Museum passageway Project
Photos and Video's of our progress
Removing ramp deck and the vegetation   8/16
Dirt bank and stone removed, ready to dig for foundation   8/17
Reroute the drain system and add a basin drain.
Starting on Foundation Forms  8/18
Pouring the cement for footing and foundation walls    8/20
Under Floor framing completed    8/23
Flooring and framing in progress   8/24
Framing for door and window /  depot roof cut back   8/25
Walls paneled and Cricket roof installed   8/28
some trim and wainscot for the stairs   9/1
Finish the ramp deck   9/6
Electrical circuits run, waiting for inspection   9/9
Linda came by and stained upper floor and staircase space  9/10
Started on drain wrap and siding outside  9/12
Window placement and siding primed both sides.
Stairs stained and ready for railings   9/17
door for museum classroom  and framing  9/17
Getting the primer and trim paint done
prepping the class room for paint
Welcome to the Silverton Country Historical Society
and Museum of Silverton, Oregon